The Construction Process
Phases of the construction process when building your home in Pinetop-Lakeside Arizona, Show Low Arizona, Snowflake Arizona, and all surrounding White Mountains Arizona communities. |
| Phase |
Event |
| 1 |
The Dig |
| 2 |
Stake in hole (if necessary), pour footings |
| 3 |
Stone inside footing area(if necessary) Load up Block |
| 4 |
Mason lay block |
| 5 |
Steel Set-Tar Applied-Walls braced-Inspection Called |
| 6 |
Backfill-Load up lumber, windows, trusses |
| 7 |
Rough Carpentry-approx. 4-5 weeks |
| 8 |
Rain Gutters-Rough heat runs-Rough Plubing |
| 9 |
Roof Shingles-Rough electric-Rough walk-through |
| 10 |
Rough inspection-Phone, Intercom, Vac system roughed in |
| 11 |
Rough carpenters wrap-(Masons)(Well)(Septic) |
| 12 |
Insulation-Load-up drywall |
| 13 |
Call for insulation inspection |
| 14 |
Drywall begins (Hung and cleaned out) |
| 15 |
Drywall finished (taped and sprayed) |
| 16 |
Finish flooring put down-Trim & Cabinets delivered |
| 17 |
Finish carpentry continues (Finish Heat) |
| 18 |
Finish carpentry (Tops measured) |
| 19 |
Interior staining |
| 20 |
Vinyl flooring-Tile-Countertops |
| 21 |
Finish Plumbing-Finish Electric |
| 22 |
Finish walk-through-Drywall repairs |
| 23 |
Finish Carpenter wrap up, stain & painting touch-up |
| 24 |
Floor finishing |
| 25 |
Occupancy inspection-CLOSING |